Go Green Solutions

Go Green SBG – STP – FRP

Go Green SBG – STP – FRP is a small buried sewage treatment equipment, based on the characteristics of large pipeline investment and difficult construction in the remote centralized treatment process of domestic sewage. On the basis of existing equipment, it draws on and absorbs advanced technologies at home and abroad, and adopts the design concept of energy-saving and high-efficiency sewage treatment equipment. Widely used in sewage treatment projects such as rural areas, scenic spots, villas, homestays, factories, etc.

go green sbg stp frp
go green sbg stp frp tank

Product Features

Compact Size and Flexible Installation: Modular design with adaptable dimensions, requiring only a small excavation pit for installation, resulting in low site requirements.

Rapid Construction, Ready-to-Use: Factory pre-fabricated with short on-site construction cycles, enabling quick system upgrades and immediate operational deployment.

Low Sludge Production: Optimized processes significantly reduce sludge generation, lowering subsequent sludge treatment costs and frequency.

Stable Treatment Performance: Mature technology adapts to fluctuations in rural wastewater quality and volume, ensuring compliant effluent quality, with enhanced performance in higher-grade models.

go green sbg stp frp technical

Technical Process

Product Parameters

Daily Capacity (m3/d) 1 2 3 4
Size (m) 1.65*1*0.98 1.86*1.1*1.37 1.95*1.1*2.25 2.25*1.45*2.25
Weight (Kg) 180 260 300 350
Installed power (kW) 0.025 0.038 0.055 0.075

The above data is for reference only. Parameters and options require mutual confirmation between both parties, and other models can be customized. Pictures are for illustrative purpose only. The final product is subject to the actual object. The company reserves the right of final explanation.

Product Enquiry

    150

    captcha

    Scroll to Top